More than 15 years ago, Phillips Petroleum and Utah Power teamed to build the Blundell Plant, the first geothermal electric plant outside of California. The hydro thermal reservoir at Blundell lies 3,000 feet below the Earth's surface and contains water at more than 500 degrees Fahrenheit and a pressure of 500 pounds per square inch.